SEDA ModuleTwo GreenPoint (V2)

Configuration:
  • Basic Modul for Module Two incl. an air processing unit and a pump housing
  • Pump for waste oil
  • Combined pump for coolant and screen wash fluid
  • 2-way fuel control 3/4″
  • Pneumatic oil swingarm with a double funnel 2,5m
  • Greenpoint Fuel Set Type -V21 (consisting of the tank drilling machine H.D. V21
  • incl. 500 pcs. sealing plugs and a rubber sleeve, a petrol pump and a hose set with a filter)
  • Quality control unit for petrol/diesel incl. a three-way-valve for separation
  • Upgrade set with a basic brake fluid pump and a holder